
COURSES SCROLL DOWN
Part L - Logic Energy Efficiency
Candidates must hold CENWAT1 to be able to complete PART L LOGIC Certificate will be issued in due course to all successful candidates
ACS Domestic Gas CCN1
CKHB1 (Domestic Gas Range Cookers and Range Cooker/Boiler)
CPA1 – Flue Gas Analyser
CENWAT1 – Central Heating/Water Heaters
HTR1 – Fires
CKR1 – Cookers
LAU1 – Laundry
DAH1 – Warm air units
MET1 – Meters
ACS Domestic Gas Renewal Packages
Including CCN1 & 3 appliances
CCN1 & 2 appliances
ACS LPG Caravan
CCLP PD/Caravan-RPH (Residential Park Homes), MC (Mobile Cabinets), EP External Pipework), B (Boats) LAV (Leisure Vehicles) Gas Safety
DAHLP1 – LPG Warm air units
WATLP1 – LPG Water Heaters
HTRLP1 – LPG Fires
LAULP1 – LPG Laundry
CKRLP1 – LPG Cookers
CENLP1 – LPG Central Heating
WATLP2 – LPG Caravan Water Heating
REFLP2 – LPG Caravan Refrigerators (And/or boats)
WAHLP1 – LPG Warm Air for Caravans (And/or boats)
HTRLP2 – LPG Gas fires widney leisure range
HTRLP3 – LPG Caravan space heaters
CPA1 mandatory for those taking CEN and/or HTR
ACS Domestic & Commercial Meters
CMA1 – Core gas safety for meter installers
CMA2LS – Core gas safety for meter installers NG L/S
MET1 – Primary & secondary domestic gas meters to 6 m/h (includes MET 2)
MET3LS – New fix primary gas meters to 6 m/h NG limited scope
MET4 – Primary diaphragm gas meters (6-40 m/h) up to 2” pipe (NG)
CMET1 – Diaphragm & rotary meters (6-1076 m/h) to 75mbar (NG)
CMET2 – Diaphragm, RPD & turbine meters up to 7 bar
Emergency Service Provider Course
CODNESP1 – Changeover core domestic to emergency services provider
Core Commercial COCN1
BMP1 – Gas Boosters Medium Pressure (formerly CBHP1)
COCN1 – Core commercial gas safety
CIGA1 – Commercial indirect fired gas heating appliances
CORT1 – Commercial overhead radiant plaque & tube heaters
ICPN1 – 1st fix of commercial pipe work up to 75mbar and 150mbar
TPCP1A – Testing & purging commercial gas installations (MOP to 40mbar)
TPCP1 – Testing & purging commercial gas installations course
Testing and Purging - Guidelines
TPCP1A – Testing & purging commercial gas installations (MOP to 40mbar) For engineers who are working on the following or below: - Natural gas only
Pipework up to 6” (150mm)
50m long Up to and under 1m³ gas
Pressure – 21mbar and below TPCP1 – Testing & purging commercial gas installations For engineers who are working above the guidelines for TPCP1A, and the following: - Natural gas or LPG
ACS Limited Scope Commercial Gas
Fix commercial Pipe work &/or Appliance Installer
ICPN 1LS – Installation first fix of commercial pipe work gas safety assessment NG & LPG
ICAE 1LS – Installation first fix of commercial appliances or equipment gas safety assessment for NG & LPG
COCNPI 1LS – Core gas safety assessment pipe installer/commissioner
ICPN1 – Installation pipe work in excess of 35mm
TPCP1A – Strength/tightness testing & purging pipe work up to 40mbar & 1m3 in volume
TPCP1 – Strength/tightness testing & purging pipe work up to 16 bar
ACS Commercial Catering
CCCN1 – Core commercial catering gas safety
COMCAT1 – Open/solid top ranges
COMCAT2 – Water boilers pressure or expansion
COMCAT3 – Deep fat & pressure fryers
COMCAT4 – Fish & chip ranges
COMCAT5 – Forced draught burner appliances
CODC1 – Domestic to commercial catering core safety changeover
COCATA – Domestic to commercial appliances changeover
ACS Commercial Catering
COMCAT 1 - Boiling burners open / solid top ranges, boiling table, stockpot stoves, hotplates Warming plates, bain-marie, hot cupboards, combination ovens, Forced convection ovens, natural convection ovens direct / semi / indirect, Combined gas microwave ovens, ancillary equipment
COMCAT 2 - Water boiler pressure type or expansion type, water boilers, Boiling pans direct / indirectly heated, pressure streamers, bulk liquid and
Jacketed urns, gas-fired dish washers, pressurised steaming ovens
COMCAT 3 - Deep fat and pressure fryers, bratt pans, griddles, grills over – and under – fired. Simulated charcoal grills, salamander grills, ancillary equipment
ACS Commercial Gas Safety Changeover
Core Domestic Changeover to “”
CODNCO1 – Changeover core domestic to core commercial
CODC1 – Changeover core domestic to commercial catering
COCATA – Changeover domestic to commercial catering appliances
Core Commercial Changeover to “”
COCDN1 – Changeover core commercial to core domestic
ACS Commercial Laundry
CCLNG1 – Core commercial laundry gas safety
COCCNGLP1 - Changeover from Domestic to Commercial Laundry
CLE1 – Commercial gas laundry, equipment
Patio Heaters/BBQ ACS Assessments
LEILP1 – Domestic single bottle supply leisure equipment, patio heaters/bbq included
ACS LPG Safety Upgrade
CONGLP1 – Changeover domestic to LPG
CONGLP (PD) (R/P/H) (LAV) (B) – Changeover domestic to LPG for permanent dwellings/residential care homes/leisure accommodation vehicles
CONGLP (CMC) – commercial mobile catering
ACS Mobile Cabinet Heater
CABLP1 - Mobile cabinet heaters
VESLP1, VESLP2, EFJLP1
VESLP1 – Single supply above & below ground pipework, to 32mm
VESLP2 – Multiple supply above and below ground pipe work, to 63mm
EFJLP1 – Polyethylene electro fusion (single and multiple NG & LPG supply)
New Starters Cat 3 – Domestic, Commercial, LPG, Catering
The new starter course is an intensive 4 week full time course, followed by 10 weeks off site. Consisting of basic gas training to give the candidate a foundation of knowledge and understanding of gas principles. At the end of the 4 weeks the candidate will have to sit a practical and theoretical assessment. Having completed the basic training and assessment the candidate has 10 weeks to produce a portfolio of on site gas work. To successfully pass this course you must complete the course work/off site assessments within 6 months of the commencement date.
Gas Safety Supervisors & Managers Seminar
Gas safety supervisors seminar – Background Examples of reportable situations under riddor – Landlords to arrange for all gas appliances to be safety checked The supervisor/manager seminar’s are tailored made to suit your specific requirements Who is exempt from the regulations Safe gas combustion Flue tests (reference BS5440: Part 1: 1990) – Methods of test, testing for spillage Extracts from the regulations – Qualification and supervision, duty of employer Management of gas contracts Steps to ensure the safe operation of a gas appliance The employment of corgi registered contractors - monitoring the contract, use of the clients own employees.
OFTEC Assessments
OFT 101 – Domestic/Light commercial commissioning & servicing. Single assessment OFT 102 - Vaporisers/Pot Burners
OFT 105E – Domestic/Light commercial installation. Single assessment
OFT 600A – Oil storage tank installation. Single assessment
Water Regulations
Legionella Course
Unvented & Vented Hot Water Systems
ACOP LPG Caravan
Approved Code of Practice (ACOP)
This course is for Gas Engineers who are working out of scope in the Gas Industry on Touring Caravans.
Training & Assessments over 4 days
The Course consists of: Gas Safety Regulations, Characteristics of LPG, Characteristics of complete and incomplete Combustion, Expansion, Flammability & Explosive Limits, Flueing & Ventilation Requirements, Supply & Operating Pressures, Pipework Installation & Sizing, Testing for Gas Tightness, Gas emergency Actions & Procedures, Positioning & Operation of Emergency Controls and Gas Controls, Inspection Checking & Testing of LPG Appliances
|